Railway Bridge Stack Broaching Case Study

Geposted von Piers Crane am

A test rig for a client needing to broach through 150mm+ of stacked steel plate, in one operation. This was successfully achieved utilising CarbideMax 200mm depth of cut TCT Broach cutters with a special stack cut Tooth Geometry to drill through each successive layer of plate without having to stop to have the slug removed.

http://holemaker-technology.com/collections/broach-cutters/products/hmt-carbidemax-tct-stack-cutter-multi-layers

The drilling had to be completed in the vertical overhead position for a Network Rail bridge strengthening project whilst under possession.

 